Rileys have removed the front parallel section of the boiler barrel and will be replacing this with a new rolled and welded seam. This will be rolled with no weld prep and tacked only. Riley’s, will then prep and weld the barrel followed by X-Ray inspection by BES, Mike Nolans. It will be then offered up for a test fit.
