Work continues on the Side Tanks

Work has proceeded extremely well on the right hand tank over the last few weeks as per the attached pictures.

7/10/2025 - The photos below show that the two bottom halves of the tank have been welded together, with the curved front section of the tank with its 8 inch radius bend temporarily mounted, along with the baffles and stays in place welded to the bottom of the tank.

October 2025 1
October 2025 2
October 2025 3
October 2025 4

 

9/10/2025 - The next two photos show the front curved section being drilled and attached to the angle iron frame above the front splasher.

October 2025 5
October 2025 6
October 2025 7

We have also ordered the first of the inside sheets that supports the reverser stand, which should also be with us in about 10 days.