Paul Orells reports on the latest progress with the new side tanks for 4561.

Angle irons
Good progress today on cleaning and painting the angle irons. The side sheets will be refitted on Tuesday, as part of the plan to get the baffles and stays in place.
Lifting eyes
I collected the lifting eyes from the shot blasters yesterday, so the first job today was to dye-penetrant test them for cracks. Nothing abnormal was found, so they were cleaned up and painted to stop them going rusty. Interestingly, one of the eyes carries a date stamp of December 1929, although we can't make out the first character.
Top sheet fittings
We also made progress fitting the various items to the top sheet. Next is the filler neck. Last time it was riveted in after the top sheet had already been riveted down, which made access a real pain. We've worked out a different order of doing things this time, which should make life a lot easier.
Other items, notably the fire iron support brackets and the water level indicator, still need drilling and fixing, but we need to finalise the exact position of these holes first.
The top beading has also been re-sequenced. Last time it got in the way of riveting the top sheet down, so this time it will be riveted on first, which means more drilling on Tuesday.
Painting
Green high-build undercoat is being applied in various places so these areas can be flatted before gloss goes on. Once the gloss has been applied and flatted again, we can start bolting on items such as the handrails and front step.

